STANDARDS AND COMPLIANCE

The offshore containers provided for rent are designed, manufactured, inspected and load tested in accordance with such standards as:

  • DNV 2.7-1

  • EN12079-1

  • ISO 10855-1

  • IMO MSC/CIRC.860 - Guidelines for the Approval of Offshore Containers Handled in Open Seas.

Offshore Container Certificate Examples

Manufacturer Certificate for

Offshore Container

Manufacturer Certificate for

Offshore Container Slings

Manufacturer Certificate for 

Offshore Container Shackles

Offshore container

Inspection Report

Schedule of examination and tests of Offshore Containers in accordance with DNV 2.7-1 / EN 12079 standards

Time or interval

Type of Inspection

Lifting Test

NDE/MPI Test (*1)

Visual Inspection

Suffix to be marked

At interval not exceeding 12-month

-

-

Yes

V

At interval not exceeding 48-month

-

Yes

Yes

VN

After substantial repair or alteration (*2)

Yes

Yes

Yes

T

Schedule of examination and tests of lifting sets for offshore Containers in accordance with DNV 2.7-1 / EN 12079 standards

Time or interval

Applicable to

Type of Inspection

Lifting Test

NDE/MPI Test (*1)

Visual Inspection

Suffix to be marked

At interval not exceeding 12-month

Complete lifting set

-

-

Yes

V

At interval not exceeding 48-month

Sling components and joining links excl. legs

Either NDE or load test

Yes

VN or T

Wire rope legs

-

-

Yes

-

Shackles

-

-

Yes

V

After substantial repair or alteration (*2)

Complete lifting set

Yes

Yes

Yes

T

(*1) Non-Destructive Examination / Magnetic Particle Inspection.

 

(*2) A substantial repair or alteration means any repair and/or alteration carried out, which may, in the opinion of the surveyor, affect the primary elements of the Offshore Container, or elements which contribute directly to its structural integrity.